Redoubt Stabilization (Spring 2005)

Northeast Ramparts Resurfacing

East Battery Resurfacing

Hoarding Being Removed from Northwest Wall

Applying Waterproofing Layer to the Barbettes

Placing the Barrel

Placing the Artillery Back on the Walls

Repointing the East Battery Parapet

Pumping Concrete for the East Battery Surface

Restored Arch 19 B

Restored Arch 19 A

Resurfacing the Barbettes

Waterproofing the Firing Step